Custom Software

Your time clock stops complying in January 2027

In this article

Nori.mx9 min read

JANUARY 20271January 1Electronic recordof the workdayMaximum workweek48 h202646 h202744 h202842 h202940 h2030Fine: up to $586,550250 to 5,000 UMA, per employer

On May 1, 2026 Mexico published a reform to the Federal Labor Law in the official gazette. What got discussed in meetings was the 40-hour week. What is going to cost you money sits elsewhere in the same decree, in a new subsection of article 132, and becomes enforceable on January 1, 2027.

It says you must record electronically each worker’s workday, start and end time, and hand it to the authority on request.

If attendance at your plant currently lives in a notebook at the guard shack, in a spreadsheet somebody fills in on Friday, or in a time clock whose data gets retyped into payroll, what you have in January does not comply. That is a little over two months away.

What the decree says, in two lines

Two different things arrived together, and it helps not to confuse them.

The workweek comes down on a staircase. The second transitory article sets the weekly maximum year by year: 48 hours in 2026, 46 in 2027, 44 in 2028, 42 in 2029 and 40 in 2030. Each step takes effect on January 1.

The record becomes electronic and mandatory. The decree took effect on May 1, 2026, but the fifth transitory article leaves the provisions of that new subsection for January 1, 2027. Failing to comply costs 250 to 5,000 Units of Measurement and Update. At the 2026 UMA of 117.31 pesos per day, that is between 29,328 and 586,550 pesos.

That fine is per employer, not per worker. For a plant with 600 operators it is not the number that hurts. What hurts comes later.

“Electronic” is the expensive word

There are three ways attendance gets kept on the border today, and all three fail for the same reason.

The notebook at the gate is not electronic, and that ends the discussion.

The spreadsheet is a file, but it gets filled in afterwards. Somebody collects the supervisors’ lists on Thursday and keys in the week. What you end up with is not a record of the workday: it is a reconstruction of the workday, made by a third party, several days late.

The cheap time clock records correctly, and then the data gets exported, opened in Excel, corrected by hand and retyped into payroll. Every one of those hands is a chance for the record to stop matching what happened at the door.

The difference is not whether the file is digital. It is whether the record is created at the moment the person walks in and out, and whether what you hand the authority is that record rather than a corrected copy of it. A system that keeps the original and separately keeps every correction — who made it and on whose authorization — complies. A file that only keeps the final figure has no way to prove anything.

The staircase moves overtime, not just the workweek

This is the part nobody is planning for, and it will show up in cost before it shows up in an inspection.

If your week is 48 hours, overtime starts at hour 49. In 2027 it starts at hour 47. In 2028, at hour 45. What is ordinary time this year gets paid double next year without anything changing on the floor.

The decree also tightens the ceilings. Article 66 caps overtime at twelve hours a week, spread over up to four hours a day across a maximum of four days. Beyond that, article 68 allows four more hours a week at a 200 percent premium, and sets a ceiling that does not move: ordinary plus overtime hours may never exceed twelve in one day. The overtime cap climbs its own staircase too: nine hours in 2026 and 2027, ten in 2028, eleven in 2029, twelve in 2030.

If your shift rotation was built assuming 48 hours and open overtime, in January you will be paying double for a block you do not pay for today, and the system that should warn you before it happens is the one you still do not have. It is the same problem that keeps the cost of a part from adding up: labor gets allocated with a stale number.

The sentence almost nobody has read

The same subsection carries one line that changes the whole calculation: the content of the electronic record constitutes full proof if it is shown to have been agreed between the worker and the employer.

Read “if it is shown to have been agreed.” It does not say the record counts because it is electronic. It says it counts because it was agreed.

Today, in a labor dispute, the burden of proof on hours worked falls on the employer: attendance controls have to be kept and produced, and failing to produce them works against you. The reform gives you, for the first time, the chance for your record to stand as full proof — but it does not come with the hardware. It comes if there is a documented agreement with your people about how time gets recorded.

Which means the most valuable piece of all this is not something you buy. It is something you agree to and sign. And the vendor selling you the reader is not going to draft it.

If your answer is a fingerprint reader, you just took on a second obligation

The easy way out is biometrics. Before signing the purchase order, it is worth knowing what that puts you into.

Mexico’s current Federal Law on Protection of Personal Data Held by Private Parties was published on March 20, 2025. Its article 2 defines sensitive data as data affecting the most intimate sphere of the person, and gives examples — racial or ethnic origin, health, genetic information, beliefs, political opinions, sexual preference. Biometric data is not on that list. But the list is illustrative rather than closed, and the test is the intimate sphere, so the prudent reading is to treat a fingerprint or face template as sensitive data.

If it is, article 8 applies: express written consent from each person, by handwritten signature, electronic signature or an authentication mechanism. A generic clause in the employment contract is not enough, the purpose has to stay limited to attendance control, and you need an alternative method — badge or PIN — for anyone who does not want to give a fingerprint.

None of this is a reason to avoid biometrics. It is a reason to budget the privacy notice and the six hundred signatures alongside the readers, instead of three months later.

Four numbers that tell you whether you make January

None of them needs software. They need an afternoon.

  • How many people clock in, across how many shifts, how many entrances and how many legal entities. One shift, one door, one employer means your problem is small and buying solves it. Three shifts, four entrances and two companies means it does not.
  • Last month: how many overtime hours were paid against a record somebody fixed by hand, and who authorized them in writing. If the second number does not exist, that is the finding.
  • How long it takes to close attendance for a pay period, and how many times the calculation got reopened after closing. A calculation that gets reopened is a record nobody will defend.
  • How many times a month somebody keys attendance into payroll. Every keying is a discrepancy waiting to appear.

What is still unknown, and why it matters

The decree leaves it to the Ministry of Labor to issue the general provisions defining the scope of that obligation and its exceptions. As of today they have not been published.

That has an immediate practical consequence: nobody can sell you a system today that “complies with the reform,” because the document defining what compliance consists of does not exist yet. If a vendor promises it to you in writing, ask which provision they are promising against.

What you can do without waiting is the part that will not change, because it depends on your operation rather than on the regulation. And it happens to be the part that takes longest.

What you can settle this week without buying anything

Four agreements. All four are free, and all four are prerequisites for any system you put in later.

One number per person, the same in payroll and at the clock. Two numbers for the same person breaks any calculation, and in plants with high turnover this happens more than people think.

Rules written down and applied the same way on every shift: grace periods, shifts that cross midnight, worked rest days, Sunday premium, attendance bonus. If each supervisor uses their own judgment, the system will only automate the disagreement.

Overtime approved before it is worked, with a record of who approved it. After the staircase, this rule stops being about order and starts being about cost control.

Every entrance accounted for. If someone can come in through a door where nothing is recorded, the data will always be incomplete, and an incomplete record is full proof of nothing.

And if making that list shows that yours is one shift, one door and one employer: buy it off the shelf. Commercial hardware handles that and you do not need custom development. You need that when you can name what no commercial clock does — your union contract rules, payroll across two entities, a rotation that changes every week, or attendance that has to flow into your payroll untouched.

One last warning, in case your attendance already runs on something built by someone who has left: when the Ministry publishes its provisions, the calculation will have to be adjusted. A system nobody can modify does not get adjusted, and that date is not yours to set.

If this landed on top of three other fronts you already had open, deciding the order is worth more than deciding the vendor. And if you want the questions above asked properly and in writing, that is what Chira is for: five minutes, and you leave with a document rather than a sales call.

References

The dates, amounts and quotations in this article come from these sources. If you are making a compliance decision, read them yourself and take it to your labor counsel: what we cover here is what they mean for a system, not legal advice.

Related service

Custom Software

Stop bending your operation to fit software that does not understand it.

See the service

Articles on this service

MASTER CONTROL 2026 final (2).xlsxJanuaryFebruaryMarch…England, October 2020.xls limit: 65,536 rows15,841cases left outNobody noticed for days

Custom Software

The spreadsheet that runs your company

Every company has a file it depends on more than it admits. When it has become a system, what to try before building, and how to migrate it without losing anything.

7 min read

CONTRACTPrototype on your dataShort deliveriesPrice by scopeThe code is yoursNamed teamAn exit doorSupport, monthly costOxford · 1,471 IT projects1 in 6+200 %over budgetMexican Copyright LawArt. 83 bisVague contract: the author wins

Custom Software

Before you sign with a software vendor

Seven things to get in writing before you hire a custom software build: what you will test, what a change costs, and who owns the code.

7 min read

Ciudad JuárezMountain Time15 minone crossingEl PasoMountain TimeOne decision, four exchangesTwelve time zones away4 daysSame time zone20 minutes

Custom Software

Nearshore, 15 minutes from El Paso

Nearshore is usually sold on hourly rate. That is the weakest reason to do it. For industrial software, the real argument is that someone can stand on your floor.

6 min read