Resources

Blog

What we learn building and running systems, written for the person who has to decide.

Latest · Order Management

Your customer has five days to change their mind

After Buen Fin come the returns. The deadlines Mexico's consumer law sets to withdraw, claim and refund, and what your order system needs to record.

6 min read

Order 4471Deliveredon FridayPaid by cardRefund:same card5 business days to withdrawfrom deliveryFSSM1T2W3T4F5If it arrived wrong2 monthsto claimYou respond in15 daysat most
One shift's week, 2027MTWTFS48 hours → 46 hours−2 hThrough 2030462027442028422029402030−2 h every Jan

Manufacturing Execution

Your 48-hour shift won't fit in January

On January 1, Mexico's maximum workweek drops to 46 hours and overtime is capped at 9. What happens to your plant's capacity and what your plan must know.

6 min read

GS1 DataMatrixCheckouts read itby the end of 2027(01)Product(10) Lot(17)Expiration(21)Serial

Warehouse Management

Your scanner and the 2D barcode coming in 2027

By the end of 2027, checkouts should read QR and DataMatrix codes, which can carry lot and expiration. What changes in your store, packaging and warehouse.

6 min read

Receiving · sortable sheetLotProductQtyReceivedFromCilantro6 casesPeppersQueso frescoTomatoes8 data points per lot at receivingFDA askshand it over in24 hoursEnforcedJul 202028Keep 2 years

Inventory Management

Which lot was the cilantro you sold?

The FDA traceability rule asks for the lot of peppers, fresh cheeses, cilantro and other foods, and for it within 24 hours. What data to keep and from when.

6 min read

Site Health › InfoServerWeb serverPHP version8.2Memory limitWordPress sites22.4 %run PHP 8.254.3 %unpatched in JanuaryPHP 8.1Dec 31, 2025PHP 8.2Dec 31, 2026PHP 8.3Dec 31, 2027PHP 8.4Dec 31, 2028PHP 8.5Dec 31, 2029

Digital Platforms

Your PHP 8.2 site stops getting patches in January

PHP 8.2 stops receiving security fixes on December 31. How to check which version your website or store runs, what order to upgrade in and which version to pick.

5 min read

IRS calendarNov 1Last testsNov 9TCC changesNov 19, 3 p.m.FIRE shuts downJan 1IRIS onlyYour FIRE file1099 · 2026from your accounting systemIRIS won't take itIRIS has two doorsPortalCSV, up to 100A2AAPI, up to 100 MB

Integration and Cloud

Your January 1099s won't go through FIRE

The IRS shuts down FIRE on November 19 and from January 1099s can only be e-filed through IRIS. Who needs a new code, what changed and which data to check.

6 min read

CUSTOMERDo not contact byPhoneWhatsAppAsked in MarchCampaignBuen FinAlready filteredLFPC 18 bisNot to thosewho said noFTC · El PasoCheck registryevery 31 days

Intelligent CRM

The customer who asked you to stop calling

A "please stop sending me promotions" that stays on one rep's phone comes back in the next campaign. What Mexican and US law say, and what to keep.

6 min read

Online store55" TV · $8,999Marketplace55" TV · $8,999Counter55" TV · $8,999In stock1sold 3 timesNOVEMBER13 — 17Buen FinArt. 43: if it says"available," you have it

Order Management

Buen Fin: you sold online what you didn't have

Your online store, the marketplace and the counter all sell from the same shelf. What Mexican law says about listing items as available, and what to fix by Friday.

5 min read

Contact usNameEmailPhone656 ··· ·· 59I accept the privacy noticePrivacy notice1Who you are2What data3What for4How to limit it5ARCO rights6If it changesRespond within20days · art. 31

Digital Platforms

Your contact form and Mexico's new privacy law

Your website asks for a name, email and phone, and that already counts as processing personal data. What the 2025 law requires and what to check this week.

6 min read

Five years from the tax returnArt. 30, Fiscal Code2026202720282029203020312032saletax returnstill retrievableArchive, no system neededCSVPDFXMLA 3-year-old invoicefound in 5 minutes

Intelligent ERP

New system? The old one stays for five years

Mexico's tax code requires keeping accounting records for five years, and your old system is part of them. What to keep, how, and why switching it off falls short.

5 min read

New bank accountFrom: billing@suppliermx.comNew account···· ···· 4821bank-statement.pdf"It has to go out today"Before changing it1Call the number already on file2Someone else approves the change3Small first payment, or wait3,046million USDBEC losses · FBI 2025

Technology Consulting

The email that changes a supplier's account

It comes from the usual address and says the supplier switched banks. How the fraud that costs businesses the most works, and the control that stops it.

5 min read

Copy 1Office serverCopy 2External driveCopy 3OffsiteRestore testFile: invoices-2026.xlsxCopy used: 3, offsiteOn another machineIt opened in full

Support and Evolution

A backup is worthless until you restore it

Almost every company backs up and almost none tests a restore. What to copy, where to keep it, how to test it and who has to own it.

7 min read

tuempresa.comRegistrantA former employeeRenewal notices go toPersonal emailAuto-renewalExpired cardRuns on itEmailWebsiteAccount recoveryCertificatesIf it lapses30daysto redeem it

Technology Consulting

Who actually owns your domain?

Your website, your email and the recovery of almost every account depend on your domain. How to find out who owns it, what happens if it expires and how to fix it.

5 min read

MASTER CONTROL 2026 final (2).xlsxJanuaryFebruaryMarch…England, October 2020.xls limit: 65,536 rows15,841cases left outNobody noticed for days

Custom Software

The spreadsheet that runs your company

Every company has a file it depends on more than it admits. When it has become a system, what to try before building, and how to migrate it without losing anything.

7 min read

WhatsApp · 9 p.m.Do you machine6061 aluminum?Could you sendthe drawing?Complete requestDrawing and rev.Material, finishVolume and lotTimingQualityShip-to, freightWho is askingNever saysPricesDatesCapacityA person confirmsLaura, by 5

AI and Automation

Your sales chatbot should not quote

What a sales assistant does well at an industrial company: it answers what is public, completes the quote request and hands it to a person. Never prices or dates.

9 min read

Technology auditThe document is yours1Inventory2Risks, ranked3What to do first4Process or software5Without buying anythingRisks, ranked1dated2no date3no date7questions it covershalf are not technical

Technology Consulting

What a technology audit should hand you

A technology audit is an inventory with judgment, not a hunt for culprits. What it reviews, what it must leave you with and how to tell if it is a sales pitch.

6 min read

RunningToday's urgent workUser accountsThe printerEmailCall the vendorDirectingThree years outRenew the contractProject orderAnnual budgetWhat data leavesWho decides?MONTHLYFixed seatat the table

Technology Consulting

Someone fixes the PCs. Who makes the calls?

Running IT and directing it are two different jobs. Which decisions get made today with nobody in charge, and when a fractional CTO makes sense and when it does not.

6 min read

2027 due datesJan 1Work-hour recordJan 12Last Server 2016 patchFeb 10Let's Encrypt: 64 daysMar 14Juárez springs forwardMar 15100-day certificatesOctWindows 10: year 3 doublesThree bucketsRequireddated, not up for debateKeep runningwhat already runsImprovethe only one competing

Technology Consulting

Your 2027 IT budget already has due dates

January, February, March and October bring costs nobody asked for that will not move. How to set them apart before the budget closes, and what to ask.

7 min read

Out of every 100 companiesEvaluated60Reached a pilot20In production5MIT NANDA, July 2025Why they stall1Picked for show2Lives on another screen3Does not learn4Nothing measured first5No owner in operations

AI and Automation

Why your AI pilot never leaves the pilot

An MIT study says 95% of companies get nothing out of generative AI. What it really measures, why pilots stall and how to pick your first project so it ships.

7 min read

Maximum lifetimeper yearBefore398 days1Mar 15, 2026200 days2Mar 15, 2027100 days4Mar 15, 202947 days8+Let's Encrypt: 64 days from Feb 10, 2027Where they liveSite and portalCustomer APIVPN and webmailProxyOne, in many places*.yourcompany.com

Integration and Cloud

Your SSL certificate no longer lasts a year

Since March 2026 a certificate lasts 200 days, and in March 2027 that drops to 100. Where yours live, what breaks when they expire and how to stop renewing by hand.

7 min read

NOVEMBERSunday12:00 → 1:00Juárez and El PasoScans1:40Pallet A1st pass1:10Pallet B2nd passDowntime−45 min1:50 → 1:05actual: 15 minBy time: B before ANight shift23:00 → 7:00Clock says8 hWorked9 h

Support and Evolution

On Sunday, 1 a.m. happens twice

This Sunday Juárez sets its clocks back an hour. What breaks that night in time clocks, reports and servers, and what to check before it happens.

7 min read

Monthly report87%Line 3and overtimeevery SaturdayHonest mathAvailability86.0%Performance85.3%Quality95.0%OEE69.7%The shift313 minuseful of 450

Manufacturing Execution

Your OEE looks high and the line falls short

The report says 87% and there is overtime every Saturday. Five ways to inflate OEE without lying, what believing it costs, and how to measure an honest one.

6 min read

Plant serverYour applicationSQL Server 2016Windows Server 2016Last patchJanuary 12, 20271Upgrade2022 or 2025, app on top2Extended updatesThrough 2030, via Azure Arc3IsolateOff the general network

Support and Evolution

Windows Server 2016 runs out of patches in January

Windows Server 2016 gets its last patch on January 12, 2027. What end of support really means, the three ways out, and why the hard part is the app that runs on it.

8 min read

CYCLE COUNTa little every dayand blindVariance sheetNP-1042shortNP-2210overNP-0375shortCause?Adjusted, no causeRecording gap above3 %of inventory costCFF art. 83

Inventory Management

Year-end inventory count: no more surprises

What Mexican law asks of you at year end, why the annual count almost never matches and what to do now so December is just a confirmation.

7 min read

CONTRACTPrototype on your dataShort deliveriesPrice by scopeThe code is yoursNamed teamAn exit doorSupport, monthly costOxford · 1,471 IT projects1 in 6+200 %over budgetMexican Copyright LawArt. 83 bisVague contract: the author wins

Custom Software

Before you sign with a software vendor

Seven things to get in writing before you hire a custom software build: what you will test, what a change costs, and who owns the code.

7 min read

LOGBOOKMicrometer · L4Drill bit · 2nd shiftTorque wrench 14Who has whatTorque wrench 14Line 43 weeks agoMicrometerLine 41 hour agoConsumablenever returnsDurablecomes backCalibratedreturns, expires

Warehouse Management

Your tool crib runs on paper. What does it cost?

Tool checkouts and returns in a notebook: the costs you do not see, what a tool crib system actually does and what to have ready before you ask for one.

8 min read

DRAFTQuoteagent preparedPriceA person signsWhen to let goWhat can be undonefirstWhat gets seenlaterPrice, date, authorityneverAcceptable correctionsInternal1 in 10Customer1 in 50

AI and Automation

The agent prepares, the person signs

How to test an AI agent before trusting it with work: what to measure, when to loosen the leash, what it never signs alone and what happens when it slips.

10 min read

MODEL COST · USDInput · 15,000 tokens0.030Output · 1,500 tokens0.015Per quote0.045440 a month × 3 calls≈ $48 a monthBy hand, 25 min each183hours a monththe same 440 quotes

AI and Automation

What an AI agent actually costs

It is not billed per user per month, it is billed per unit of work. Where the money goes, the three discounts almost nobody uses, and the part no vendor invoices.

10 min read

Crosses freelyManuals, standards, totalsCrosses with a contractYour costs, your pricesDoes not crossCustomer drawings, IDsGet it in writingfrom the model provider1No training on your data2How long it keeps it3Where, and with whom4Breach notice · art. 19

AI and Automation

What you can and cannot send to a model

Mexico's data protection law changed in 2025 and INAI is gone. What it now says about sending data to an AI provider, and the customer NDA that outweighs the law.

11 min read

JANUARY 20271January 1Electronic recordof the workdayMaximum workweek48 h202646 h202744 h202842 h202940 h2030Fine: up to $586,550250 to 5,000 UMA, per employer

Custom Software

Your time clock stops complying in January 2027

From January 1, 2027 Mexican employers must record the workday electronically, with fines up to 586,000 pesos. What the decree says and what to settle now.

9 min read

Out of 10 ordersHow many come fromregular customers?You already have itReorder portalif they are regularsSees past ordersSees their priceReorders in 2 clicksOwn loginWorth the most:Has it shipped?Online storeif they are strangersCatalog · cart · card checkout

Digital Platforms

An online store, or a customer portal?

Not two sizes of the same thing: two different products. The ratio that decides which one is yours, and the four things to settle before you build either.

6 min read

Cost of the partStandard set two years agoMaterialpurchasing, invoiced?Laborplanned 4 h, ran 6Scrapnotebook, end of shiftMONTH CLOSE15days laterthree people, on a weekend

Intelligent ERP

What does that part actually cost you?

If the cost you quote from was set two years ago, you are guessing. Where the money hides, what you can measure this week, and the agreement to make first.

6 min read

Orders come in byEmailEDI · portalPhoneWhatsAppSales repTHIS WEEKMTWTFTue: you promisedThu: their line stopsWhat was it based on?Inventorywhen is it committed?On confirmingAt picking

Order Management

You promised a date. What did you base it on?

The order shipped late and nobody can say where it broke. How orders actually reach you, who owns the date, and the moment inventory gets committed.

6 min read

1Quote sent2Customer replied3Sample approved4Order receivedOpen quotesCustomerAmountNext actionno date, no ownerNo reply in90days: it closes

Intelligent CRM

Your rep left and took the pipeline

If customer information lives in one person's inbox, it is not your company's. How to get it back, what to settle before a CRM, and what to measure first.

6 min read

Five frontsWarehouse sheetAnnex 24EDI deadlineNew machinesAIThree criteria1Cost today?2How many touch it?3Can it be undone?in this orderONE PAGEWhat goes firstToday's costOwner, by nameIn 90 daysWhen to stop

Technology Consulting

Five problems, one budget. Which one first?

How to order the list when everything is urgent: three criteria that decide, the order you do not get to choose, and the signs that it is not time to buy.

7 min read

final_v3system.execonfig.inidata.mdb12 years on the floorThe two-hour testIs the source code there?Is it in version control?Does it build today?Does it run on a copy of the DB?If #1 fails, it is an installation

Support and Evolution

You inherited software nobody documented

It works, nobody knows how, and the person who wrote it is gone. How to tell whether it can be rescued or has to be replaced, and what to do in week one.

7 min read

ANSI X12830Forecast862Firm schedule850/860PO and change856Ship notice810Invoice997Acknowledgment824Error notice856 · ASNPallet › box › pieceSent when the truck leavesBox labelSame ID

Integration and Cloud

When your customer demands an EDI connection

The email with the deadline just arrived. What they are actually asking for, which path fits your volume, and the chargeback nobody mentions up front.

7 min read

ERPowns:Closes the monthPart catalogPurchase orderCostFinancialsSame countERP900Scanner880Which one wins?FLOORowns:Runs the minuteLocationScanDowntime reasonOperatorExact time

Intelligent ERP

When the corporate ERP does not reach the floor

You have SAP and the warehouse still runs on a spreadsheet. The problem is rarely the ERP. It is the last fifteen meters of the operation.

7 min read

Ciudad JuárezMountain Time15 minone crossingEl PasoMountain TimeOne decision, four exchangesTwelve time zones away4 daysSame time zone20 minutes

Custom Software

Nearshore, 15 minutes from El Paso

Nearshore is usually sold on hourly rate. That is the weakest reason to do it. For industrial software, the real argument is that someone can stand on your floor.

6 min read

One lineone monthNetworked PLCSignals onlyManual entryStop reasonsA closed list,same on every shift10–12Before connecting1Named downtime2What a good part is3The machine talks4Network on the floor5The operator gains6An owner from ops

Manufacturing Execution

What has to be ready before you connect a machine

An MES project rarely fails because of the software. It fails because the plant was not ready, and you can know that before signing anything.

5 min read

Quote requestFrom: buyer5,000 pcsRE: make it 4,800 pcsdrawing.pdfThe agentReads the emailPulls out the partsSearches past quotesGets material costDrafts the quoteBefore it goes outa person signs

AI and Automation

What an AI agent is and how it helps your business

It is not a chatbot. It is software that takes steps until a job is done. Five concrete uses for a maquiladora supplier, and where it should not go.

7 min read

By balance1,200piecesfrom which entry?In layers, by customs entryMarch entrytemporary import400June entrytemporary import500Exported in Augustinside finished goods280Scraphas to reconcile too20

Inventory Management

Annex 24: what it asks of your inventory system

It is not a report you run at month end. It is a way of recording every movement that most inventory systems were never designed to handle.

6 min read

The ERP knows400how manyThe WMS knowsWhere it isWho moved itWhenIf the count gappasses2 %it's structural

Warehouse Management

When does a maquiladora in Juarez need a WMS?

The operational signs that your ERP is no longer enough for the warehouse, what a WMS actually solves, and what to have ready before you buy one.

5 min read

Subscribe via RSS

Tell us what is costing you time or money

A 20-minute call with Jesús Hernández or Roberto Urita. You do not need to arrive with everything defined.
No cost, no strings.

Get your free prototype I prefer to write