Manufacturing Execution

Industry 4.0

Your production line connected, monitored and optimized in real time.

The MES connects every machine, operator and order into one system. Sensors capture plant data every second and AI turns it into decisions: failure alerts, parameter adjustments and maintenance warnings before production stops.

Know your real efficiency, not the figure reported by hand. See in minutes where productivity is lost, which machine is degrading and how much avoidable downtime you tolerate each week.

StationsCycle timesQuality

What the system does

Real-time monitoring

Boards on the floor and in the office showing every machine, order and shift, without waiting for the daily report.

Predictive maintenance

AI reads vibration, temperature and power draw to flag a failure pattern before the machine stops.

Automated efficiency

Automatic availability, performance and quality per cell, with the real causes of loss.

AssessmentBuildGo live

Getting it running on the floor

  • Plant audit: We assess your machines, the communication protocols available and your monitoring priorities.
  • Sensor installation: We deploy the devices needed with minimal intervention on your line.
  • ERP connection: We sync orders, material consumption and real costs with your planning system.
  • Model calibration: We tune anomaly detection to the specific parameters of your machinery.

How much avoidable downtime does your plant tolerate each week?

Book a technical visit and we will work out the return of putting the MES in place.

Request a technical visit

Articles on this service

One shift's week, 2027MTWTFS48 hours → 46 hours−2 hThrough 2030462027442028422029402030−2 h every Jan

Manufacturing Execution

Your 48-hour shift won't fit in January

On January 1, Mexico's maximum workweek drops to 46 hours and overtime is capped at 9. What happens to your plant's capacity and what your plan must know.

6 min read

Monthly report87%Line 3and overtimeevery SaturdayHonest mathAvailability86.0%Performance85.3%Quality95.0%OEE69.7%The shift313 minuseful of 450

Manufacturing Execution

Your OEE looks high and the line falls short

The report says 87% and there is overtime every Saturday. Five ways to inflate OEE without lying, what believing it costs, and how to measure an honest one.

6 min read

One lineone monthNetworked PLCSignals onlyManual entryStop reasonsA closed list,same on every shift10–12Before connecting1Named downtime2What a good part is3The machine talks4Network on the floor5The operator gains6An owner from ops

Manufacturing Execution

What has to be ready before you connect a machine

An MES project rarely fails because of the software. It fails because the plant was not ready, and you can know that before signing anything.

5 min read