Manufacturing Execution
Your 48-hour shift won't fit in January
On January 1, Mexico's maximum workweek drops to 46 hours and overtime is capped at 9. What happens to your plant's capacity and what your plan must know.
The MES connects every machine, operator and order into one system. Sensors capture plant data every second and AI turns it into decisions: failure alerts, parameter adjustments and maintenance warnings before production stops.
Know your real efficiency, not the figure reported by hand. See in minutes where productivity is lost, which machine is degrading and how much avoidable downtime you tolerate each week.
Boards on the floor and in the office showing every machine, order and shift, without waiting for the daily report.
AI reads vibration, temperature and power draw to flag a failure pattern before the machine stops.
Automatic availability, performance and quality per cell, with the real causes of loss.
Book a technical visit and we will work out the return of putting the MES in place.
Request a technical visitManufacturing Execution
On January 1, Mexico's maximum workweek drops to 46 hours and overtime is capped at 9. What happens to your plant's capacity and what your plan must know.
Manufacturing Execution
The report says 87% and there is overtime every Saturday. Five ways to inflate OEE without lying, what believing it costs, and how to measure an honest one.
Manufacturing Execution
An MES project rarely fails because of the software. It fails because the plant was not ready, and you can know that before signing anything.
Want to see the other services?
All services