Topic

Industry 4.0

2 articles

One lineone monthNetworked PLCSignals onlyManual entryStop reasonsA closed list,same on every shift10–12Before connecting1Named downtime2What a good part is3The machine talks4Network on the floor5The operator gains6An owner from ops

Manufacturing Execution

What has to be ready before you connect a machine

An MES project rarely fails because of the software. It fails because the plant was not ready, and you can know that before signing anything.

5 min read

The ERP knows400how manyThe WMS knowsWhere it isWho moved itWhenIf the count gappasses2 %it's structural

Warehouse Management

When does a maquiladora in Juarez need a WMS?

The operational signs that your ERP is no longer enough for the warehouse, what a WMS actually solves, and what to have ready before you buy one.

5 min read

Tell us what is costing you time or money

A 20-minute call with Jesús Hernández or Roberto Urita. You do not need to arrive with everything defined.
No cost, no strings.

Get your free prototype I prefer to write