Topic

Manufacturing

7 articles

WhatsApp · 9 p.m.Do you machine6061 aluminum?Could you sendthe drawing?Complete requestDrawing and rev.Material, finishVolume and lotTimingQualityShip-to, freightWho is askingNever saysPricesDatesCapacityA person confirmsLaura, by 5

AI and Automation

Your sales chatbot should not quote

What a sales assistant does well at an industrial company: it answers what is public, completes the quote request and hands it to a person. Never prices or dates.

9 min read

Cost of the partStandard set two years agoMaterialpurchasing, invoiced?Laborplanned 4 h, ran 6Scrapnotebook, end of shiftMONTH CLOSE15days laterthree people, on a weekend

Intelligent ERP

What does that part actually cost you?

If the cost you quote from was set two years ago, you are guessing. Where the money hides, what you can measure this week, and the agreement to make first.

6 min read

Five frontsWarehouse sheetAnnex 24EDI deadlineNew machinesAIThree criteria1Cost today?2How many touch it?3Can it be undone?in this orderONE PAGEWhat goes firstToday's costOwner, by nameIn 90 daysWhen to stop

Technology Consulting

Five problems, one budget. Which one first?

How to order the list when everything is urgent: three criteria that decide, the order you do not get to choose, and the signs that it is not time to buy.

7 min read

final_v3system.execonfig.inidata.mdb12 years on the floorThe two-hour testIs the source code there?Is it in version control?Does it build today?Does it run on a copy of the DB?If #1 fails, it is an installation

Support and Evolution

You inherited software nobody documented

It works, nobody knows how, and the person who wrote it is gone. How to tell whether it can be rescued or has to be replaced, and what to do in week one.

7 min read

ERPowns:Closes the monthPart catalogPurchase orderCostFinancialsSame countERP900Scanner880Which one wins?FLOORowns:Runs the minuteLocationScanDowntime reasonOperatorExact time

Intelligent ERP

When the corporate ERP does not reach the floor

You have SAP and the warehouse still runs on a spreadsheet. The problem is rarely the ERP. It is the last fifteen meters of the operation.

7 min read

Ciudad JuárezMountain Time15 minone crossingEl PasoMountain TimeOne decision, four exchangesTwelve time zones away4 daysSame time zone20 minutes

Custom Software

Nearshore, 15 minutes from El Paso

Nearshore is usually sold on hourly rate. That is the weakest reason to do it. For industrial software, the real argument is that someone can stand on your floor.

6 min read

One lineone monthNetworked PLCSignals onlyManual entryStop reasonsA closed list,same on every shift10–12Before connecting1Named downtime2What a good part is3The machine talks4Network on the floor5The operator gains6An owner from ops

Manufacturing Execution

What has to be ready before you connect a machine

An MES project rarely fails because of the software. It fails because the plant was not ready, and you can know that before signing anything.

5 min read

Tell us what is costing you time or money

A 20-minute call with Jesús Hernández or Roberto Urita. You do not need to arrive with everything defined.
No cost, no strings.

Get your free prototype I prefer to write