Manufacturing Execution

Your 48-hour shift won't fit in January

On January 1, Mexico's maximum workweek drops to 46 hours and overtime is capped at 9. What happens to your plant's capacity and what your plan must know.

6 min read

Monthly report87%Line 3and overtimeevery SaturdayHonest mathAvailability86.0%Performance85.3%Quality95.0%OEE69.7%The shift313 minuseful of 450

Manufacturing Execution

Your OEE looks high and the line falls short

The report says 87% and there is overtime every Saturday. Five ways to inflate OEE without lying, what believing it costs, and how to measure an honest one.

6 min read

One lineone monthNetworked PLCSignals onlyManual entryStop reasonsA closed list,same on every shift10–12Before connecting1Named downtime2What a good part is3The machine talks4Network on the floor5The operator gains6An owner from ops

Manufacturing Execution

What has to be ready before you connect a machine

An MES project rarely fails because of the software. It fails because the plant was not ready, and you can know that before signing anything.

5 min read